Amazon Fulfillment Center

Chattanooga, TN

SET provided Construction Engineering Inspection for the mass grading, utility installation and building pad construction for the Amazon warehouse in the Enterprise South Industrial Park. In addition, SET performed storm water inspections and verified that all erosion control measures were installed  and maintained correctly.

Blast for Phase I 02a Dressed the areas behind the curb at the entrance to the north access road 01 Dressing areas in the South parking lot 02 Glover equipment excavating sediment pond 1 basin Installation of storm water drainage east of Junction Box 123 01 Phase I slab 01 Placing and spreading material on Phase I 01 Undercutting area South of Phase I 01